







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
CGI Home Additions & ADU: The Homestead Owner’s Guide
An addition or ADU built to CGI’s specification in Homestead typically runs $45,000 – $130,000 for a home addition and $90,000 – $220,000 for a full ADU, with garage conversions landing at $30,000 – $80,000. We build these to CGI-compatible standards, quote a flat written price before anyone picks up a tool, and schedule around Homestead’s permitting calendar rather than our own convenience. This is planned construction, not emergency work, so we don’t promise a crew tomorrow; we promise the number in writing first.
Owners usually discover a failing CGI-spec addition the same way: a hairline crack over the header that grows a little each rainy season, a door that sticks only in August, or a roofline that sags where the new framing ties into the old. Homestead’s humidity and hurricane-season wind load turn small framing issues into visible ones fast. By the time a friend points at your addition and asks what happened, the problem has usually been working for two or three seasons.
Key Takeaways
- Additions: $45,000 – $130,000 in Homestead; ADUs: $90,000 – $220,000.
- Every project starts with a flat written price and a written scope. No exceptions.
- No change proceeds without a signed change order, which is why our jobs finish within a few percent of the agreed number.
- We’re an independent contractor and are not affiliated with CGI.
Which CGI Models This Applies To

CGI’s residential addition and ADU framing packages show up on plans under a handful of naming patterns: a series prefix (their “R” and “M” lines cover most single-family additions, while the ADU packages sit under a separate series code), a span rating, and a wind-load suffix. Homestead projects almost always carry the higher wind-load suffix because of South Florida’s exposure category, and that suffix is the first compatibility gotcha: a panel rated for a lower exposure that fits perfectly on paper will not pass a Homestead inspection. Check the label stapled to the header stock or printed on the plan’s framing schedule for the series prefix, the span, and the exposure suffix before you match anything.
The second gotcha is span versus opening width. A CGI header sized for a 12-foot opening is not interchangeable with one sized for a 16-foot slider, even when the depth and species look identical. On the OEM-versus-aftermarket decision: for engineered framing connectors and hangers, match the CGI spec exactly rather than substituting a “close enough” bracket, because the published load table is what the inspector reads. For finish materials and cladding, quality aftermarket equivalents are fine and often cost less. The structural pieces are where we don’t improvise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Signs Your CGI Home Additions & ADU Is Failing
Framing and envelope failures in Homestead announce themselves in patterns. Here are the five we see most often, and what’s actually happening underneath.
- Stair-step cracks in the drywall above a door or window. The header is deflecting more than it should, usually because a connector loosened or the load path has a gap. Cosmetic patching hides it for a season; it comes back.
- A door that sticks only in humid months. This is wood swelling against a tight frame, and it points to moisture getting in where the addition ties into the original wall. Homestead’s summer humidity makes the symptom obvious. The cause is usually a missing or failed flashing detail at the roofline junction.
- Water stains on the ceiling near the tie-in. The most common cause is a underlayment or flashing step that was never lapped correctly where the new roof meets the old. It looks like a roof leak and often is one, but the addition junction is the first place to check.
- A visible sag in the new roofline. Sheathing deflection or an undersized rafter, which on CGI packages usually means a panel was swapped for one with a lower span rating than the plan called for. This one doesn’t fix itself.
- Musty smell in the ADU that never quite clears. Air sealing or vapor management failed somewhere in the envelope, and moisture is trapped rather than vented. In Homestead’s climate this shows up within a year, not five.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

The ranges below are what we quote for Homestead, and they’re the same numbers you’ll see on our other pages:
| Project | Installed Range (Homestead) |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What moves the number: square footage, whether the addition sits on slab or pier, the wind-load exposure details Homestead requires, and how much of the tie-in to the existing structure has to be opened up. The quote breaks out materials and labor line by line, so you can see where the money goes. We don’t quote a range and then find a reason to widen it; under Clause 1 of the Haven Standard, the price is written before anyone starts, and no change proceeds without a signed change order. Workmanship carries our 365-Day Done Right Promise: if it isn’t done right, we make it right. If you have a competitor’s written estimate, our Free Second Opinion reviews it line by line at no charge.
DIY or Call Us?
There’s a real split here, and it matters. An owner can safely check the obvious cosmetic items: look for cracks, test the sticking doors, feel for soft spots in drywall, and photograph the labels on any exposed framing. That’s a starting point, not a diagnosis.
Where DIY goes wrong is at the structural connection. Replacing a header, tightening a load-bearing connector, or opening a wall to inspect framing is dangerous work: the wrong move can drop a load on you or void your wind-load compliance. Homestead’s exposure category means an improperly anchored piece isn’t just wrong, it’s a safety and inspection liability. This is not the place to learn on a weekend. Call us at (844) 834-4248 and we’ll tell you what we found, in plain terms, with photos.
FAQs

How long does a CGI-compatible addition or ADU last in Homestead? Twenty-five to forty years for a properly built framing package with a maintained envelope, though in Homestead’s humidity the envelope details at the tie-in are what determine whether you get the longer end. The framing itself rarely fails; the flashings and seals do, and those need a look every few years.
Can it be repaired instead of replaced? Often, yes. A stuck door or a localized crack is usually a targeted repair at the connector or flashing. Full replacement only enters the conversation when the deflection is structural or the load path is compromised. Our Free Second Opinion will tell you which one you’re looking at before you spend a dollar.
How long does the swap or rebuild take? A targeted repair runs a day or two. A full addition or ADU is weeks to months depending on scope and permitting, and we schedule around Homestead’s inspection timeline. We’ll give you a realistic schedule in the written scope, not an optimistic one.
How do we source the right part? We match the CGI series prefix, span, and wind-load suffix on the plan to the connector or panel spec, and we buy the structural pieces to that spec exactly. Finish materials we source from a vetted brand list of fifty-plus suppliers, including KraftMaid, Cambria, and Silestone for interior packages. We don’t claim to stock any part on a truck; we source to your project.
Call (844) 834-4248 for an exact quote. Estimates are free.
Ready to price it properly? Call Rowan Construction Group Homestead at (844) 834-4248 for a free estimate on your CGI-compatible addition or ADU. You’ll get a written price before work starts, a documented photo record on every visit, and a team that answers the phone with a live person, 24/7.
Written by the team at Rowan Construction Group Homestead, serving Homestead and nearby areas.












