







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterTub-to-Shower Conversion in Homestead, FL
A tub-to-shower conversion in Homestead typically costs $4,200 to $11,500 for a full tear-out and replacement, and most jobs are finished in three to six working days. We remove the old tub and its surround, address whatever the wall cavity shows us, and set a new walk-in shower on a properly sloped, waterproofed base. If you want the number in writing before anyone picks up a tool, call Rowan Construction Group Homestead at (844) 834-4248 and we’ll put a flat price and a written scope in front of you first.
This is the smaller sibling of our Bathroom Remodeling in Homestead work, and we treat it with the same discipline: written price, signed change orders, and a photo record of the substrate before tile goes over it. If you’re weighing whether to convert one shower or rework the whole room, our parent service, Bathroom Remodeling, lays out the full picture.
Key Takeaways
- Most conversions run $4,200 to $11,500 depending on base type, tile, and whether the drain line moves.
- Homestead’s hard water and humidity are real factors – we specify materials that hold up to both.
- Waterproofing failures, not tile, cause the overwhelming majority of shower callbacks. We document the membrane before any finish goes on.
- Every job gets a flat written price, a written scope, and a written warranty before work begins.

When You Need Tub-to-Shower Conversion
The reasons homeowners in Homestead call us about a conversion are usually practical, not cosmetic. Here’s what we hear most:
- Stepping over the tub has become unsafe. A parent or grandparent in the home who can’t clear a 15-inch tub wall safely is the single most common reason we get called. A low-threshold or curbless shower removes the hazard entirely.
- The tub is never used. In a two-bath home, the hall tub often sits dry for years while everyone showers. Reclaiming that footprint for a full walk-in shower is money spent on something you’ll actually stand in.
- The surround is failing. Caulk lines that stay dark, grout that crumbles in sheets, or a soft spot near the drain – these are signs water has been getting behind the wall. In Homestead’s humidity, once a surround starts trapping moisture it rarely dries out on its own.
- The tub is cracked or the finish is worn through. A fiberglass tub with a spider crack or an enamel finish worn to the base isn’t worth resurfacing. A conversion replaces the whole wet area rather than patching it.
- You’re planning to age in place. A walk-in shower with a bench and a proper grab-bar backing (blocking set into the wall framing before tile, not screwed in after) is the version of this that still works in fifteen years.
- You’re reworking the room’s layout. If the toilet or vanity is moving anyway, converting the tub to a shower at the same time often saves on demo and rough-in compared to doing them separately.
Our Tub-to-Shower Conversion Process
Every conversion follows the same documented sequence. Nothing gets covered up until it’s been photographed and signed off.
- Written price and scope. Before any demo, you get a flat price, a written scope of what’s included, and a written warranty. Under Clause 1 of The Haven Standard, the number is written before anyone starts. No “call for a quote” – the price is on paper.
- Protected demo. We lay floor protection, shut off and cap the water, and remove the tub and surround. We take photos of the framing and the valve as they’re exposed.
- Substrate and rough-in assessment. If the wall cavity shows rot or the drain needs to move, we stop and write a change order – and no work proceeds on that change until you’ve signed it. That’s the administrative discipline that keeps projects within a few percent of the agreed price.
- Waterproofing. We install a sloped shower base or a poured pan, a waterproof membrane (a bonded sheet or liquid-applied, depending on the assembly), and backer board. The membrane gets photographed before a single tile is set. This is the step that determines whether the shower lasts.
- Tile and trim. Tile, a niche if the scope calls for one, a bench, and grab-bar blocking set into the framing. We use Kohler or Toto fixtures on the valve and trim – the brands that hold up and that you can get parts for years from now.
- Final walkthrough and photo record. We test the drain, check the valve, and leave you with the documented photo record of the visit as standard – not as an upgrade. That’s your evidence of what was found and what was done.

Tub-to-Shower Conversion Pricing in Homestead
A tub-to-shower conversion in Homestead generally lands between $4,200 and $11,500. The wide range reflects how much of the wet area gets rebuilt, not a vague “it depends.” Here’s the line-item breakdown we use when we write a quote:
| Item | Typical Range |
|---|---|
| Demo and disposal of tub and surround | $350 – $700 |
| Shower base or poured pan (with slope) | $600 – $1,600 |
| Waterproofing membrane and backer board | $500 – $1,200 |
| Tile and installation (walls and floor) | $1,800 – $4,500 |
| Valve, trim, and showerhead (Kohler/Toto) | $300 – $900 |
| Glass door or panel | $500 – $1,800 |
| Bench, niche, or grab-bar blocking | $250 – $800 |
| Drain relocation or rough-in changes | $400 – $1,400 |
What moves the number: tile choice (a porcelain that reads like stone is usually the value pick; natural stone runs higher), whether the drain has to move, whether the wall cavity has rot behind the surround, and whether you go curbless. A curbless shower costs more because the floor framing and waterproofing assembly are more involved – but if accessibility is the goal, it’s the right spend.
Every quote we hand you is a flat price with a written scope and a written warranty. If you have a competitor’s written estimate, we’ll review it line by line at no charge – that’s our Free Second Opinion, and it applies to any estimate, from anyone.
FAQs – Tub-to-Shower Conversion
How much does a tub-to-shower conversion cost in Homestead?
A tub-to-shower conversion in Homestead typically costs $4,200 to $11,500, with most straightforward jobs landing in the $6,000 to $8,500 range. Tile, base type, drain relocation, and glass all move the final number. Call (844) 834-4248 for a flat written price – the estimate is free and the price is on paper before any work starts.
Can you convert a tub to a shower in the same footprint?
Yes – in most cases the tub’s footprint becomes the shower without moving the drain, because a standard tub and a standard 36-inch shower pan occupy nearly the same slot. The drain relocation is only needed when you want a curbless design or a different shower size. We’ll tell you which scenario you’re in after we’ve seen the drain location, and it’s written into the scope before demo.
How long does the conversion take?
Three to six working days for most Homestead conversions, once the written price is signed. The bulk of that time is waterproofing and tile cure, not demolition. If structural repair or a drain move comes up mid-job, we stop, write a change order, and get your signature before proceeding – so the timeline only changes with your approval, not by surprise.
Is it cheaper to repair or replace my tub and surround?
Replace. Resurfacing a tub or regrouting a surround costs less upfront, but on a shower that’s failing due to water behind the wall, resurfacing hides the problem instead of fixing it. In Homestead’s humidity, a surround that’s already trapping moisture won’t dry out – so the money goes into the same failing assembly. A conversion replaces the wet area with a proper sloped pan and waterproofed walls. Call (844) 834-4248 and we’ll walk you through what’s actually failing before you spend a dollar.
Why Rowan Construction Group Homestead for a Tub-to-Shower Conversion
This is the kind of job where the finishes get the attention and the waterproofing decides whether it lasts. We quote a flat written price before anyone picks up a tool, we document the membrane and the substrate with photos before tile goes over them, and no change proceeds without a signed change order. Our technicians have up to 19 years of experience, crews are background-checked and uniformed, and a live person answers calls around the clock. Every visit includes a documented photo record as standard – you leave with evidence of what was found and what was done, not a promise.
We use real brands with real spec sheets: Kohler and Toto on the valve and trim, and for the wider bath build, materials from vetted names across our fifty-plus brand network. Our quote reflects honest numbers, not inflated ones, because the written price is our founding promise, not a process step. If it’s not done right, our 365-Day Done Right Promise says we make it right – backed by The Haven Standard, not a handshake.
Other Work We Handle in Homestead
Tub-to-shower conversions are one of seven trades we run. If your project touches more than the wet area, we can quote it in the same written scope:
- Roofing in Homestead – GAF, Owens Corning, and CertainTeed systems.
- Windows and Doors in Homestead – impact-rated options for South Florida.
- Fence Installation in Homestead – privacy and pool-safety fencing.
- Driveway and Pavers in Homestead – Belgard and Techo-Bloc.
- Home Additions and ADUs in Homestead – including in-law suites and detached units.
- Kitchen Remodeling in Homestead – KraftMaid and Wellborn cabinets, Cambria and Caesarstone tops.
For a focused comparison of the broader bath project, our Bathroom Remodeling in Homestead guide covers full-room scope and pricing. You can also start from our home page to see every trade in one place.
Get Your Written Price Today
If a tub in your Homestead home has become a hazard or a space you don’t use, a conversion is the fix – and the price should be on paper before anyone starts. Call Rowan Construction Group Homestead at (844) 834-4248 for a free estimate. We’ll put a flat written price, a written scope, and a written warranty in front of you, and if you’ve got a competitor’s estimate, bring it – we’ll review it line by line at no charge. Calls are answered by a live person around the clock.
Written by the team at Rowan Construction Group Homestead, serving Homestead.


