







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterHow Much Does Tub-to-Shower Conversion Cost in Homestead?
Tub-to-shower conversion in Homestead typically costs $3,500 to $10,000, with most single-tub swaps landing near $6,000. That range covers demolition, new waterproofing, tile or an acrylic surround, a shower pan, a drain relocation, and a glass door or curtain rod. A simple acrylic conversion sits at the low end; a fully tiled walk-in with a bench and frameless glass pushes toward the top.
We’re Rowan Construction Group, and we put that number in writing before anyone touches your bathroom. Under Clause 1 of The Haven Standard, you get a flat written price and a written scope before work starts, which means the estimate you screenshot is the estimate you pay.
Key Takeaways
- Most Homestead conversions run $3,500 to $10,000; the midpoint for a standard tub swap is around $6,000.
- Drain relocation is the single biggest cost driver in Homestead’s older ranch homes, where the tub drain often sits off-center for a shower pan.
- A full conversion is typically cheaper than a bathroom remodel at $9,000 to $28,000 because you keep the existing layout, walls, and vanity.
- Written price, written scope, signed change orders. No work moves forward on a change until you sign it.
- Free second opinion on any written estimate you bring us. We’ll review it line by line at no charge.

Tub-to-Shower Conversion Cost Breakdown (2026)
Here’s how the $3,500 to $10,000 range breaks into line items. These are 2026 Homestead-market numbers, so you can compare them against any quote you’re holding.
| Line item | Typical range | Notes |
|---|---|---|
| Demolition and haul-away | $300 – $700 | Cast-iron tubs cost more to break out than fiberglass |
| Rough plumbing and drain relocation | $400 – $1,200 | Highest in homes where the drain is off-center |
| Shower pan and waterproofing membrane | $500 – $1,400 | Schluter or Wedi systems; the layer that stops leaks |
| Wall tile or acrylic surround | $800 – $2,800 | Acrylic low end; porcelain or ceramic tile high end |
| Shower valve and fixtures | $300 – $900 | Kohler and Toto carry a premium over builder-grade |
| Glass door or curtain enclosure | $400 – $1,800 | Frameless glass is the top of the range |
| Labor and installation | $800 – $1,200 | Covers framing adjustments and finish work |
All told, a straightforward acrylic conversion with a sliding door runs about $3,500 to $5,000. A fully tiled walk-in with a bench, niche, and frameless glass climbs toward $8,000 to $10,000. The variables that matter most are the substrate condition behind the old tile, whether the drain has to move, and the finish level you choose.
Two things push the number up fast. First, if the old tub sits on a concrete slab in a Homestead home and the drain needs to shift laterally, you’re cutting and patching slab. Second, if there’s any sign of prior water damage behind the surround, we won’t tile over it. We document what we found, show you the photo record, and price the repair as a signed change order before touching it. That’s the discipline that keeps projects within a few percent of the agreed cost.
What Affects Tub-to-Shower Conversion Pricing in Homestead
Homestead isn’t Miami Beach, and the construction realities here are specific. These are the factors that move the price most in this market.
- Drain position and slab construction. A lot of Homestead ranch homes built between the 1950s and 1980s have the tub drain set for a standard 60-inch tub, not a walk-in pan. Relocating it is routine but adds $400 to $1,200 and often means cutting the slab in a home with a concrete floor rather than a framed subfloor.
- Substrate condition behind the old tile. We open the wall and look at what’s there. Greenboard or drywall behind a surround means the framing may need repair. Cement board in good shape means no change. This is where a written quote earned its keep, because it prices what’s actually in the wall rather than guessing.
- Finish level: acrylic versus tile. An acrylic surround keeps cost near $3,500 to $5,000 and cleans easily. Porcelain tile with a Schluter membrane, a bench, and a niche pushes $8,000 to $10,000. Both are legitimate choices; the difference is material and labor hours.
- Glass enclosure choice. A framed slider runs $400 to $800. Frameless 3/8-inch glass with a single panel can reach $1,800. In a small Homestead bathroom, a frameless panel often reads as more space than the room has.
- Fixture brand and finish. We source Kohler and Toto fixtures, among other vetted brands, and the price difference between builder-grade and those lines is real but usually $300 to $600 across a full set. You decide which you want before the quote is final.
- Permit requirements. A tub-to-shower conversion with drain relocation usually requires a plumbing permit in Miami-Dade County. Permit cost and inspection scheduling are not free, and we build them into the written quote so there are no surprises.
- Humidity and ventilation. South Florida’s humidity means a shower with a weak exhaust fan grows mildew faster. We’ll note whether your fan moves enough air and quote a replacement as a line item if it doesn’t. Tiling over a moisture problem is money spent twice.
If you’re weighing a full walk-in shower installation against a conversion of the tub you have, the walk-in route runs $4,500 to $12,000 and opens floor space you don’t currently use. For many Homestead homeowners, the conversion is the smarter spend because it keeps the plumbing where it is and the room stays functional in under a week.

How to Save on Tub-to-Shower Conversion
You can’t get a real conversion under $3,500 in this market and expect it to last, but there’s meaningful room to land at the lower end of the range. These are the levers that actually work.
- Keep the drain where it is. If your existing tub drain can feed a new shower pan without relocation, you save $400 to $1,200 and skip the slab cut. Ask for this option explicitly before anyone finalizes a quote.
- Choose acrylic over tile if the budget is tight. A quality acrylic surround with a framed slider gets you a finished conversion near $4,000. It’s not the same product as a tiled walk-in, and you should know that going in, but it’s a real, durable option.
- Keep the existing plumbing rough-in. If we can reuse the valve body and existing supply lines, you avoid tearing into the wall further. We note this in the scope when it applies.
- Combine with a vanity or floor refresh now rather than later. A bathroom vanity installation runs $800 to $3,000, and doing it while the room is already open saves the mobilization and access cost of a second visit.
- Get a free second opinion on any quote you have. Bring a competitor’s written estimate and we’ll review it line by line at no charge. We’re not trying to beat a number for sport; we’ll tell you plainly if something is missing from the scope, because a missing line item is where a cheap quote turns expensive.
One thing we won’t do is quote a low number to win the job and then grow it with change orders. Every change gets a signed change order before we proceed. That’s the whole point of the system. For a straightforward Homestead conversion, the written number and the final number are the same number.
Is a Tub-to-Shower Conversion Cheaper Than a Full Bathroom Remodel?
Yes. A tub-to-shower conversion in Homestead runs $3,500 to $10,000, while a full bathroom remodel runs $9,000 to $28,000, and a small bathroom remodel runs $5,000 to $12,000. The difference is scope: a conversion keeps your walls, vanity, toilet, flooring, and layout intact and only rebuilds the wet area. A full remodel touches everything. If your vanity and flooring are in good shape, the conversion is the efficient spend. If they’re not, a bathroom remodel done once beats two separate projects.
FAQs – Tub-to-Shower Conversion Cost
What does a typical tub-to-shower conversion cost in Homestead?
Most Homestead conversions run $3,500 to $10,000, with a standard acrylic conversion landing around $4,000 to $5,000 and a fully tiled walk-in with frameless glass near $10,000. The midpoint for a straightforward job is about $6,000. Call (844) 834-4248 for an exact written quote on your bathroom, and it’s free.
Can you convert my tub to a shower in one day?
No, a one-day conversion isn’t realistic for a properly waterproofed job. A quality conversion takes three to seven working days, and most Homestead jobs land in four to five. Demo and rough-in take a day or two, waterproofing and tile take another day or two, and grout, glass, and final inspection finish it out. If a crew promises a one-day tiled shower, either the waterproofing or the finish work is being skipped. Call (844) 834-4248 to schedule a free assessment.
Does a tub-to-shower conversion need a permit in Homestead?
In most cases, yes. A conversion with drain or plumbing relocation typically requires a plumbing permit through Miami-Dade County, and most permitted jobs include an inspection before the wall closes. The permit and inspection costs are built into our written quote, not billed later. Call (844) 834-4248 and we’ll walk through what your specific bathroom needs.
Is it cheaper to repair the tub or convert to a shower?
A tub liner or refinish runs roughly $400 to $1,200 and buys you a few years. A full conversion runs $3,500 to $10,000 and changes how the room functions permanently. If the tub is cracking, leaking, or you need an accessible shower, the conversion is the better long-term spend; if the tub just looks tired, a refinish is a fair stopgap. Call (844) 834-4248 and we’ll tell you honestly which answer fits your bathroom.
What’s included in your written tub-to-shower conversion price?
Our flat written price includes demolition and haul-away, shower pan and waterproofing, wall finish, fixtures if you’ve chosen them, labor, permit costs, and a documented photo record of the work, which we deliver as standard, not an upsell. Every conversion is covered under the 365-Day Done Right Promise, printed on the page. Call (844) 834-4248 for a free estimate in Homestead.
What If I Already Have a Shower That Needs Replacing?
A shower replacement in Homestead runs $3,000 to $8,500, roughly $1,000 to $1,500 less than a conversion at the low end because there’s no tub to demolish or drain to relocate. If a tub is being replaced entirely rather than converted, or if a worn shower is being rebuilt in place, tell us during the estimate and we’ll quote the correct scope. Many of the same waterproofing decisions apply. The number you want written down is the number that matches what’s actually in your wall, which is why we open the space and document it before finalizing.
Why Our Written Price Holds
We’ve delivered more than 4,000 projects since 2007, and every one of them started with a written price and written scope before a tool came out of the truck. Our technicians have up to 19 years of experience, they’re background-checked and uniformed, and a live person answers our line 24/7. When our crew shows up, you get a documented photo record of what they found and what they did, included as standard. That’s the Haven Standard at work: not a slogan, a documented process. If something isn’t done right within 365 days, we come back and make it right, backed by a printed promise rather than a handshake.
The reason this matters on a conversion is that the two most expensive surprises, hidden water damage and a drain that has to move, both live behind the wall. Everything in our process is built to price what’s actually there before we start rather than discovering it after.
Get a Written Price on Your Tub-to-Shower Conversion
You have questions about what your conversion will cost in Homestead, and we’d rather answer them than have you guess from a range. Call (844) 834-4248 for a free estimate, or bring a competitor’s written quote and we’ll give you a free second opinion, line by line, at no charge. We’ll open the space, tell you plainly what we found, and hand you a flat written price with a written scope and a written warranty before any work starts. Estimates are free, and the number on the page is the number you pay. For the full picture of what we build across our trades, start with the bathroom and work outward from there.
Pricing reflects the Homestead market as of 2026. Rowan Construction Group Homestead offers free estimates – call (844) 834-4248.
What Our Customers Say
"They found an old septic line under the driveway run and stopped, documented it, and re-quoted before continuing."
- Xavier L."Good communication throughout. Weekly written update meant I never had to chase them."
- Nadine G."Solid work, decent crew, and the site was left tidy every evening."
- Pearl A.












